Skip to content

01Free Template · Excel and PDF

2-2-3 Shift Schedule Template: Free Pitman Rotation (Excel + PDF)

Free 2-2-3 shift schedule template for four crews on 12-hour shifts, with weekly hours per crew and the workweek start that cuts overtime from 20 hours to 8.

2-2-3 Pitman shift schedule template for four crews in Excel and PDF

How the 2-2-3 Schedule Works

The 2-2-3 schedule, also called the Pitman schedule, covers a 24/7 operation with four crews on 12-hour shifts. Two crews share the day shift and two share the night shift. Each crew repeats a 14-day cycle: 2 days on, 2 off, 3 on, then 2 off, 2 on, 3 off. That is 7 shifts and 84 hours in two weeks, an average of 42 hours a week, and every other weekend off as a three-day weekend.

CrewWedThuFriSatSunMonTueHours
A: week 1offoffonononoffoff36
A: week 2ononoffoffoffonon48
B: week 1ononoffoffoffonon48
B: week 2offoffonononoffoff36

Crews A and B cover days; crews C and D follow the same two rows on nights. The Excel template lays out all four crews for 28 days, counts the hours of each crew per week and shows who is on shift every day. Change the start date and every date follows.

The Workweek Start Decides the Overtime

Federal overtime is counted per workweek: a fixed, recurring period of 168 hours that does not have to match the calendar week and may begin on any day. Hours are never averaged across weeks (DOL Fact Sheet #23; 29 CFR 778.105). On a 2-2-3 rotation that makes the first day of your workweek worth real money:

Workweek runsHours in the two weeksOvertime per 14-day cycleOvertime per person per year
Wednesday to Tuesday36 and 488 hours208 hours
Monday to Sunday60 and 2420 hours520 hours

The shifts are identical in both rows; only the line between the weeks moves. With a Monday start, one week holds five shifts (60 hours) and the next two (24 hours). With a workweek that begins on the first day off before the long weekend, each week holds three or four shifts. An employer may set the workweek, but it has to stay fixed: a change must be meant to be permanent and not designed to avoid overtime.

California is different. Daily overtime applies after 8 hours in a workday (California Labor Code § 510), so a 12-hour shift normally carries 4 overtime hours. Alternative workweek schedules adopted under the Labor Code follow their own rules. Check the California overtime calculator before you publish a 12-hour rotation there.

Pros, Cons and What to Watch

  • For: never more than three shifts in a row, a three-day weekend every other week, and the same crew always works together.
  • Against: 12-hour shifts are long, especially on nights, and built-in overtime raises labor cost in the 48-hour week.
  • Fixed or rotating: crews can stay on days or nights, or swap every cycle or every few cycles. Fixed crews adapt better; rotating crews share the night burden.
  • Handover: the outgoing and incoming crews overlap only for minutes. Decide what is handed over in writing and where.

A schedule is the plan; the punches are what happened. With Draivix Time & Attendance, each crew member taps a badge at the terminal, the system pairs arrivals and departures into shifts, and the supervisor approves the timesheet against the plan. On the floor, the shop-floor terminal records who worked on which job. Compare with the DuPont schedule, which gives each crew a full week off every month.

Last reviewed: November 18, 2026. This page explains general rules and is not legal advice.

02Frequently Asked Questions

How many hours a week is a 2-2-3 schedule?

42 hours on average: 84 hours over the 14-day cycle on 12-hour shifts. With a workweek that starts on Wednesday the weeks alternate between 36 and 48 hours; with a Monday start they are 60 and 24.

How does overtime work on a 2-2-3 schedule?

Under federal law overtime is owed for hours over 40 in each workweek, and weeks are not averaged. With 36- and 48-hour weeks that is 8 overtime hours per two-week cycle. A badly placed workweek start (60 and 24 hours) produces 20. California adds daily overtime after 8 hours.

How many employees do you need for a 2-2-3 schedule?

Four crews. Multiply the number of people needed on shift at one time by four, then add cover for vacation and sick days.

Is the 2-2-3 schedule the same as the Pitman schedule?

Yes. Pitman schedule, 2-2-3 and 2-3-2 are names for the same family of 12-hour rotations in which a crew works 2 days, is off 2, works 3, and then the pattern flips.

Let’s start together

Tell us how your business works.

We will show you what a system that takes over part of that work could look like.

Book a consultation